Mosman Demolition Conditions

6 demolition conditions imposed by Mosman across 1 development application in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

Condition 36 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

36. In accordance with Section 6.6 of the Environmental Planning and Assessment Act 1979, no site works (including building works, demolition, excavation or the removal of vegetation) are to commence until: (i) the Construction Certificate has been issued; (ii) the person benefiting from the consent has appointed a Principal Certifying Authority (PCA); (iii) in instances where Council is not the PCA, the PCA has no later than two days before the building work commences, notified Council of his or her appointment and notified the person benefiting from the consent of any critical stage inspections and other inspections that are to be carried out in respect of the building work; (iv) the…

Condition 6 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

6. A sign must be erected in a prominent position on any site on which building work, subdivision work or demolition work is being carried out: (a) showing the name, address and telephone number of the principal certifying authority for the work; and (b) Showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours; and (c) stating that unauthorised entry to the work site is prohibited. Any such sign shall be maintained while the building work, subdivision work or demolition work is being carried out, but must be removed when the work has been completed. This condition does not apply in relation…

Condition 35 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

35. Prior to the issue of the Construction Certificate a fee for the inspection of damage to Council’s roads and footpaths from building and demolition work must be paid to Council. The fee is to be paid at the Customer Service Centre at Mosman Council to ledger number 1040210.3207.028. The inspection will be carried out after the Occupation Certificate has been issued. Note: Fees are reviewed annually. For details refer to Council’s current Fees and Charges Schedule at the time of payment. PRIOR TO THE COMMENCEMENT OF SITE WORKS The following measures must be satisfied prior to the commencement of site works, including any works relating to demolition, excavation or vegetation removal.…

Condition 42 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

42. Where asbestos material shall be removed or disturbed as a result of any proposed demolition, alteration or addition, all work must be carried out by a person licensed under the Work Health and Safety Regulation 2011 and undertaken in accordance with the requirements of the Protection of the Environment Operations (Waste) Regulation 2014. All asbestos to be removed must be disposed of at a tip recommended by the NSW Environment Protection Authority and under no circumstances shall be re used or sold. Construction within Boundary

Condition 40 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

40. All works shall be carried out in accordance with the recommendations contained in the geotechnical report prepared byJK Geotechnics dated 7 March 2025. Strict adherence to inspections and further assessment as required and any subsequent reports are to be abided by. DURING SITE WORKS / CONSTRUCTION The following conditions must be satisfied during site and construction works. Demolition

Condition 41 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

41. All demolition work must be carried out in accordance with the provisions of Australian Standard 2601: The Demolition of Structures. Asbestos Material