Campbelltown Demolition Conditions
18 demolition conditions imposed by Campbelltown across 3 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.
68. Hoarding Requirements Where any works associated with the approved development are located in close proximity to a public place such that occupation of part of the public place may be required to complete the development, then it will be necessary to erect either an “A” Class or “B” Class hoarding. Should a hoarding need to be constructed on or over Council land/property, then the following requirements will apply:- The approved development includes/requires either an “A” Class or “B” Class or both type of hoarding to be erected. Should such a hoarding need to be constructed on or over Council land/property, then the following requirements will apply:- • “A” Class Requirements An…
74. Hoarding Requirements Where any works associated with the approved development are located in close proximity to a public place such that occupation of part of the public place may be required to complete the development, then it will be necessary to erect either an “A” Class or “B” Class hoarding. Should a hoarding need to be constructed on or over Council land/property, then the following requirements will apply:- The approved development includes/requires either an “A” Class or “B” Class or both type of hoarding to be erected. Should such a hoarding need to be constructed on or over Council land/property, then the following requirements will apply:- • “A” Class Requirements An…
2. It is a condition of the development consent that a sign must be erected in a prominent position on a site on which building work, subdivision work or demolition work is being carried out— a. showing the name, address and telephone number of the principal certifier for the work, and b. showing the name of the principal contractor, if any, for the building work and a telephone number on which the principal contractor may be contacted outside working hours, and c. stating that unauthorised entry to the work site is prohibited.
2. It is a condition of the development consent that a sign must be erected in a prominent position on a site on which building work, subdivision work or demolition work is being carried out— a. showing the name, address and telephone number of the principal certifier for the work, and b. showing the name of the principal contractor, if any, for the building work and a telephone number on which the principal contractor may be contacted outside working hours, and c. stating that unauthorised entry to the work site is prohibited.
2. It is a condition of the development consent that a sign must be erected in a prominent position on a site on which building work, subdivision work or demolition work is being carried out— a. showing the name, address and telephone number of the crown certifier for the work, and b. showing the name of the principal contractor, if any, for the building work and a telephone number on which the principal contractor may be contacted outside working hours, and c. stating that unauthorised entry to the work site is prohibited.
4. This section does not apply in relation to— a. building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building, or b. Crown building work certified to comply with the Building Code of Australia under the Act, Part 6. DET001 4712/2024/DA-SL PAGE 2 Condition reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021. D.01.070.P
4. This section does not apply in relation to— a. building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building, or b. Crown building work certified to comply with the Building Code of Australia under the Act, Part 6. Condition reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021.
4. This section does not apply in relation to— a. building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building, or b. Crown building work certified to comply with the Building Code of Australia under the Act, Part 6. Condition reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021.
5. Showing the name, address and telephone number of the crownl certifier for the work. Any such signs are to be maintained while the building work, subdivision work or demolition work is being carried out, but must be removed when the work has been completed. Condition reason: Prescribed condition under Section 70 of the Environmental Planning and Assessment Regulation 2021. D03.02
60. Toilet on construction site Before any site work commences on the land, toilet facilities are to be provided, at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out, at the rate of one toilet for every 20 persons or part thereof. Each toilet provided must be a standard flushing toilet and be connected to:
66. Toilet on construction site Before any site work commences on the land, toilet facilities are to be provided, at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out, at the rate of one toilet for every 20 persons or part thereof. Each toilet provided must be a standard flushing toilet and be connected to:
5. Showing the name, address and telephone number of the principal certifier for the work. Any such signs are to be maintained while the building work, subdivision work or demolition work is being carried out, but must be removed when the work has been completed. Condition reason: Prescribed condition under Section 70 of the Environmental Planning and Assessment Regulation 2021.
3. The sign must be— a. maintained while the building work, subdivision work or demolition work is being carried out, and b. removed when the work has been completed.
3. The sign must be— a. maintained while the building work, subdivision work or demolition work is being carried out, and b. removed when the work has been completed.
3. The sign must be— a. maintained while the building work, subdivision work or demolition work is being carried out, and b. removed when the work has been completed.
1. This section applies to a development consent for development involving building work, subdivision work or demolition work.
1. This section applies to a development consent for development involving building work, subdivision work or demolition work.
70. Demolition works Demolition works shall be carried out in accordance with the following:
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Demolition conditions in other councils
Newcastle
115 conditions
Ku-ring-gai
81 conditions
Wollongong
78 conditions
Burwood
76 conditions
Cumberland
63 conditions
Sutherland
42 conditions
Willoughby
41 conditions
Bayside
39 conditions
Randwick
30 conditions
City of Ryde
26 conditions
Lane Cove
25 conditions
Inner West
24 conditions
Waverley
23 conditions
Canterbury-Bankstown
21 conditions
City of Parramatta
19 conditions
Hornsby
18 conditions
City of Sydney
16 conditions
Georges River
16 conditions
Strathfield
16 conditions
Camden
13 conditions
Blue Mountains
10 conditions
Hawkesbury
9 conditions
Wollondilly
9 conditions
Liverpool
8 conditions
Fairfield
8 conditions
Canada Bay
7 conditions
Mosman
6 conditions
Lake Macquarie
5 conditions
Woollahra
4 conditions