Northern Beaches Traffic & Access Conditions

7 traffic & access conditions imposed by Northern Beaches across 3 development applications in our dataset. Traffic and access conditions address vehicle and pedestrian movement — driveway and vehicle crossing design, sight lines, road and footpath works, traffic management plans and access for service and emergency vehicles.

DA2024/1303 det. 05/08/2025

• cleaning services, • personal care, • nursing care. Any variation to the approved land uses and/occupancy beyond the scope of the above definition will require the submission to Council of a new development application. Reason: To ensure compliance with the terms of this consent. • Prescribed conditions (Demolition): • A sign must be erected in a prominent position on any site on which building work, subdivision work or demolition work is being carried out: • showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and • stating that unauthorised entry to the work site is prohibited. Any…

Condition 18 Mod2025/0381 det. 17/11/2025 S4.56 Modification to DA2015/0901

18. Add the following condition: 20F. Vehicle Access and Parking (Stage 2 - Hotel/Motel) All internal driveways, vehicle turning areas, garages and vehicle parking space/ loading bay dimensions must be designed and constructed to comply with the relevant section of AS 2890 (Off-street Parking standards). With respect to this, the following revision(s) must be undertaken; All internal driveways and vehicle access ramps must have ramp grades and transitions complying with AS 2890.1. To ensure the gradient requirements and height clearances are satisfied, a driveway profile must be prepared for all internal ramps showing ramp lengths, grades, surface RL's and overhead clearances, taken from…

Mod2024/0549 det. 03/02/2025

E. Add Condition 31C. Photovoltaic Panels - to read as follows: The Height of the Photovoltaic Panels shown on the roof plan (Plan A1.06) is to not to exceed RL21.60. Details demonstrating compliance are to be submitted to the Certifying Authority prior to the issue of the Construction Certificate. Reason: To ensure compliance with the terms of this consent. F. Add Condition 31D. Green Roof landscaping - to read as follows: Landscape treatment details indicating the proposed soil depth and planting for the car lift green roof shall be submitted and approved by the Certifying Authority prior to the issue of a Construction Certificate for any works above basement slab level. The following…

Condition 40 Mod2025/0381 det. 17/11/2025 S4.56 Modification to DA2015/0901

40. Add the following condition: 42A. Fire Safety Matters (Stage 2 - Hotel/Motel) At the completion of all works, a Fire Safety Certificate will need to be prepared which references all the Essential Fire Safety Measures applicable and the relative standards of Performance (as per Schedule of Fire Safety Measures). This certificate must be prominently displayed in the building and copies must be sent to Council and Fire and Rescue NSW. Details demonstrating compliance are to be submitted to the Principal Certifier prior to the issue of a part Occupation Certificate or Occupation Certificate. Each year the Owners must send to the Council and Fire and Rescue NSW, an annual Fire Safety…

Condition 17 Mod2025/0381 det. 17/11/2025 S4.56 Modification to DA2015/0901

17. Add the following condition: 20E. Waste and Service Vehicle Access - 8.8m Medium Rigid Vehicle (Stage 2 - Hotel/Motel) Access to the on-site loading bay area including ramp grades, transitions and height clearance shall be designed to comply with forward in and forward out access of an 8.8m Medium Rigid Vehicle (MRV), as a minimum requirement. The height clearance required is 4.5m. Swept path diagrams must include details of the road including, kerb line, line marking, signs, traffic devices, power poles, other structures and neighbouring driveways. Plans showing the ramp grades, transitions and height clearance and swept path diagrams of 8.8m MRV shall be submitted to and approved by…

Condition 19 Mod2025/0381 det. 17/11/2025 S4.56 Modification to DA2015/0901

19. Add the following condition: 43A. Loading Dock Management Plan (Stage 2 - Hotel/Motel) A Loading Dock Management Plan shall be prepared by the applicant and submitted to and approved by the Principal Certifier prior to the issue of any Occupation Certificate. The Plan will need to demonstrate how loading dock will be managed to ensure that there will be only one vehicle entering and exiting the loading dock access in any period and how safe servicing arrangements including waste collection will be undertaken without interrupting general traffic. Vehicle queuing on public road(s) is not permitted. Reason: To ensure the loading dock is managed appropriately and that tenants are aware of…

Condition 55 Mod2025/0381 det. 17/11/2025 S4.56 Modification to DA2015/0901

55. Sight Lines within the Carpark (Stage 2 - Hotel/Motel) The required sight lines to pedestrians and other vehicles in and around the carpark and entrance(s) are not to be obstructed by landscaping or signage. Reason: To maintain unobstructed sight distance for motorists.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.