Cumberland Demolition Conditions

63 demolition conditions imposed by Cumberland across 8 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

Condition 93 DA2024/0732 det. 09/10/2025 Mixed Use

93. DADWD02 - Demolition - Asbestos For demolition works involving asbestos, standard commercially manufactured signs containing the words "DANGER ASBESTOS REMOVAL IN PROGRESS" measuring not less than 400m x 300mm are to be erected in prominent visible positions on the site during asbestos removal works. Barricades to delineate and isolate the asbestos removal area and prevent public access are to be installed prior to the commencement of asbestos removal works and remain in place until works are completed. The Document Set ID: 12052763 Version: 4, Version Date: 29/09/2025 type of barricading should reflect the level of risk. All demolition and site works involving the removal and disposal…

Condition 69 da2024/0085 det. 06/09/2024 Basketball Centre

69. DADWD02 - Demolition - Asbestos For demolition works involving asbestos, standard commercially manufactured signs containing the words "DANGER ASBESTOS REMOVAL IN PROGRESS" measuring not less than 400m x 300mm are to be erected in prominent visible positions on the site during asbestos removal works. Barricades to delineate and isolate the asbestos removal area and prevent public access are to be installed prior to the commencement of asbestos removal works and remain in place until works are completed. The type of barricading should reflect the level of risk. All demolition and site works involving the removal and disposal of asbestos must only be undertaken by contractors who hold a…

Condition 100 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

100. DADWD02 - Demolition - Asbestos For demolition works involving asbestos, standard commercially manufactured signs containing the words "DANGER ASBESTOS REMOVAL IN PROGRESS" measuring not less than 400m x 300mm are to be erected in prominent visible positions on the site during asbestos removal works. Barricades to delineate and isolate the asbestos removal area and prevent public access are to be installed prior to the commencement of asbestos removal works and remain in place until works are completed. The type of barricading should reflect the level of risk. All demolition and site works involving the removal and disposal of asbestos must only be undertaken by contractors who hold a…

Condition 95 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

95. DADWD02 - Demolition - Asbestos For demolition works involving asbestos, standard commercially manufactured signs containing the words "DANGER ASBESTOS REMOVAL IN PROGRESS" measuring not less than 400m x 300mm are to be erected in prominent visible positions on the site during asbestos removal works. Barricades to delineate and isolate the asbestos removal area and prevent public access are to be installed prior to the commencement of asbestos removal works and remain in place until works are completed. The type of barricading should reflect the level of risk. All demolition and site works involving the removal and disposal of asbestos must only be undertaken by contractors who hold a…

Condition 84 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

84. DADWD02 - Demolition - Asbestos For demolition works involving asbestos, standard commercially manufactured signs containing the words "DANGER ASBESTOS REMOVAL IN PROGRESS" measuring not less than 400m x 300mm are to be erected in prominent visible positions on the site during asbestos removal works. Barricades to delineate and isolate the asbestos removal area and prevent public access are to be installed prior to the commencement of asbestos removal works and remain in place until works are completed. The type of barricading should reflect the level of risk. All demolition and site works involving the removal and disposal of asbestos must only be undertaken by contractors who hold a…

Condition 7 DA2024/0540 det. 01/04/2025 Staged construction of a two storey administration building for Regents Park Christian…

7. DADWD02 - Demolition - Asbestos For demolition works involving asbestos, standard commercially manufactured signs containing the words "DANGER ASBESTOS REMOVAL IN PROGRESS" measuring not less than 400m x 300mm are to be erected in prominent visible positions on the site during asbestos removal works. Barricades to delineate and isolate the asbestos removal area and prevent public access are to be installed prior to the commencement of asbestos removal works and remain in place until works are completed. The type of barricading should reflect the level of risk. All demolition and site works involving the removal and disposal of asbestos must only be undertaken by contractors who hold a…

Condition 5 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

5. DAPDB02 - Notice of Demolition At least five working days prior to the commencement of demolition work, notice must be given to adjoining residents of the following:  The date when demolition will commence;  Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; and  The telephone number of the SafeWork NSW Hotline. At least five working days prior to the commencement of demolition work, notice must be given to Council of the following:  The date when demolition will commence;  Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer;  A copy of the notification…

Condition 6 DA2024/0540 det. 01/04/2025 Staged construction of a two storey administration building for Regents Park Christian…

6. DAPDB02 - Notice of Demolition At least five working days prior to the commencement of demolition work, notice must be given to adjoining residents of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; and • The telephone number of the SafeWork NSW Hotline. At least five working days prior to the commencement of demolition work, notice must be given to Council of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; • A copy of the notification…

Condition 9 DA2024/0732 det. 09/10/2025 Mixed Use

9. DAPDB02 - Notice of Demolition At least five working days prior to the commencement of demolition work, notice must be given to adjoining residents of the following:  The date when demolition will commence;  Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; and  The telephone number of the SafeWork NSW Hotline. At least five working days prior to the commencement of demolition work, notice must be given to Council of the following:  The date when demolition will commence;  Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer;  A copy of the notification…

Condition 5 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

5. DAPDB02 - Notice of Demolition At least five working days prior to the commencement of demolition work, notice must be given to adjoining residents of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; and • The telephone number of the SafeWork NSW Hotline. At least five working days prior to the commencement of demolition work, notice must be given to Council of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; • A copy of the notification…

Condition 7 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

7. DAPDB02 - Notice of Demolition At least five working days prior to the commencement of demolition work, notice must be given to adjoining residents of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; and • The telephone number of the SafeWork NSW Hotline. At least five working days prior to the commencement of demolition work, notice must be given to Council of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; • A copy of the notification…

Condition 7 da2024/0085 det. 06/09/2024 Basketball Centre

7. DAPDB02 - Notice of Demolition At least five working days prior to the commencement of demolition work, notice must be given to adjoining residents of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; and • The telephone number of the SafeWork NSW Hotline. At least five working days prior to the commencement of demolition work, notice must be given to Council of the following: • The date when demolition will commence; • Details of the name, address and business hours contact telephone number of the demolisher, contractor or developer; • A copy of the notification…

Condition 20 DA2024/0732 det. 09/10/2025 Mixed Use

20. DACCB05 - Fees to be paid to Council Types of fees Amount Payment timing Demolition Inspections x 2 $604.00 Prior to Demolition Damage Deposit $8,032.72 Prior to Demolition Sect. 7.11 Contributions $1,134,355.00 + CPI Prior to issue of CC Construction Traffic $409.00 Prior to issue of CC Management Plan Kerb Crossing Bond (Related $6,970.00 Prior to issue of CC to Driveways) Driveways Inspections $881.00 Prior to issue of CC TOTAL $1,151,251.72 + CPI where applicable Payment of the above fees shall be paid to Council in accordance with timing stipulated above. Please note that other fees and charges may be applicable to the proposal. Fees to be paid to Council will be determined at the…

Condition 18 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

18. DACCB05 - Fees to be paid to Council Types of fees Amount Payment timing Demolition Inspections (2 $604.00 Prior to Demolition Inspections) Damage Deposit $38,683.39 Prior to Demolition Sect. 7.11 Contributions $3,040,043.00+ CPI Prior to CC Construction Traffic $409.00 Prior to CC Management Plan Kerb Crossing Bond (Related $6,970.00 Prior to CC to Driveways) Driveways Inspections (2 $881.00 Prior to CC Inspections) TOTAL $3,087,590.39 + CPI where applicable Payment of the above fees shall be paid to Council in accordance with timing stipulated above. Please note that other fees and charges may be applicable to the proposal. Fees to be paid to Council will be determined at the time of…

Condition 19 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

19. DACCB05 - Fees to be paid to Council Types of fees Amount Payment timing Document Set ID: 11758583 Version: 1, Version Date: 14/07/2025 Demolition Inspections $604.00 Prior to CC Damage Deposit $2,171.70 Prior to CC Sect. 7.11 Contributions $111,168.00 + CPI Prior to CC Construction Traffic $409.00 Prior to CC Management Plan Driveways Inspections $444.00 Prior to CC TOTAL $114,796.7 + CPI where applicable Payment of the above fees shall be paid to Council in accordance with timing stipulated above. Please note that other fees and charges may be applicable to the proposal. Fees to be paid to Council will be determined at the time of payment in accordance with Council’s adopted Fees and…

Condition 20 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

20. DACCB05 - Fees to be paid to Council Types of fees Amount Payment timing Demolition Inspections $722.00 Prior to issue of CC Damage Deposit $13,015.00 Prior to issue of CC Assessment of the $409 Prior to issue of CC. Construction Traffic Management Plan TOTAL $14,146 Payment of the above fees shall be paid to Council in accordance with timing stipulated above. Please note that other fees and charges may be applicable to the proposal. Fees to be paid to Council will be determined at the time of payment in accordance with Council’s adopted Fees and Charges Policy and may therefore exceed the fee amount quoted above. Note: In the event that the applicant does not apply for a refund of…

Condition 99 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

99. DADWD01 - Notice of Demolition Demolition work is to be carried out by a licenced demolition contractor in accordance with AS 2601- 2001 and may only be carried out between 7.00am to 5.00pm on Mondays to Saturdays, excluding public holidays. Jackhammers, rock breakers, heavy machinery and the like may not be used on Saturdays. No demolition work is to take place on Sundays or public holidays. Within fourteen days of the completion of demolition works, the applicant must lodge with Council, all original weighbridge receipts issued by the receiving waste disposal facility. (Reason: To ensure compliance with the relevant legislation and to ensure public and work safety)

Condition 92 DA2024/0732 det. 09/10/2025 Mixed Use

92. DADWD01 - Notice of Demolition Demolition work is to be carried out by a licenced demolition contractor in accordance with AS 2601- 2001 and may only be carried out between 7.00am to 5.00pm on Mondays to Saturdays, excluding public holidays. Jackhammers, rock breakers, heavy machinery and the like may not be used on Saturdays. No demolition work is to take place on Sundays or public holidays. Within fourteen days of the completion of demolition works, the applicant must lodge with Council, all original weighbridge receipts issued by the receiving waste disposal facility. (Reason: To ensure compliance with the relevant legislation and to ensure public and work safety)

Condition 94 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

94. DADWD01 - Notice of Demolition Demolition work is to be carried out by a licenced demolition contractor in accordance with AS 2601- 2001 and may only be carried out between 7.00am to 5.00pm on Mondays to Saturdays, excluding public holidays. Jackhammers, rock breakers, heavy machinery and the like may not be used on Saturdays. No demolition work is to take place on Sundays or public holidays. Within fourteen days of the completion of demolition works, the applicant must lodge with Council, all original weighbridge receipts issued by the receiving waste disposal facility. (Reason: To ensure compliance with the relevant legislation and to ensure public and work safety)

Condition 163 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

163. DAANN22 - Obtaining a Construction Certificate for Building Work This Development Consent does not constitute approval to carry out construction work. Construction work may only commence upon the issue of a Construction Certificate, appointment of a Principal Certifier, and lodgement of Notice of Commencement. If demolition is associated with the erection of or extension to an existing building, then demolition must not commence prior to the issue of a Construction Certificate. (Reason: Information) Document Set ID: 11758583 Version: 1, Version Date: 14/07/2025

Condition 89 DA2024/0330 det. 28/11/2024 Community Facilities

89. DAANN22 - Obtaining a Construction Certificate for Building Work This Development Consent does not constitute approval to carry out construction work. Construction work may only commence upon the issue of a Construction Certificate, appointment of a Principal Certifier, and lodgement of Notice of Commencement. If demolition is associated with the erection of or extension to an existing building, then demolition must not commence prior to the issue of a Construction Certificate. (Reason: Information) Document Set ID: 11236492 Version: 4, Version Date: 22/11/2024

Condition 99 DA2024/0331 det. 09/05/2025 Mixed - Alterations and additions to the approved development (DA2022/0776)

99. DAANN22 - Obtaining a Construction Certificate for Building Work This Development Consent does not constitute approval to carry out construction work. Construction work may only commence upon the issue of a Construction Certificate, appointment of a Principal Certifier, and lodgement of Notice of Commencement. If demolition is associated with the erection of or extension to an existing building, then demolition must not commence prior to the issue of a Construction Certificate. (Reason: Information) Document Set ID: 11576038 Version: 4, Version Date: 01/05/2025

Condition 10 DA2024/0732 det. 09/10/2025 Mixed Use

10. DAPDB08 - Demolition Inspections Council (not a private certifier) must inspect the site prior to and after demolition works. Payment of the demolition inspection fee in accordance with Council’s current fees and charges policy must be made. To arrange a Council inspection contact Council’s Customer Service on 8757 9000. After completion of demolition works, the applicant must notify Council within 7 days to assess the site and ensure compliance with AS2601-2001 - Demolition of Structures. (Reason: To ensure compliance with the relevant legislation)

Condition 7 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

7. DAPDB08 - Demolition Inspections Council (not a private certifier) must inspect the site prior to and after demolition works. Payment of the demolition inspection fee in accordance with Council’s current fees and charges policy must be made. To arrange a Council inspection contact Council’s Customer Service on 8757 9000. After completion of demolition works, the applicant must notify Council within 7 days to assess the site and ensure compliance with AS2601-2001 - Demolition of Structures. (Reason: To ensure compliance with the relevant legislation)

Condition 6 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

6. DAPDB08 - Demolition Inspections Council (not a private certifier) must inspect the site prior to and after demolition works. Payment of the demolition inspection fee in accordance with Council’s current fees and charges policy must be made. To arrange a Council inspection contact Council’s Customer Service on 8757 9000. After completion of demolition works, the applicant must notify Council within 7 days to assess the site and ensure compliance with AS2601-2001 - Demolition of Structures. (Reason: To ensure compliance with the relevant legislation)

Condition 9 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

9. DAPDB08 - Demolition Inspections Council (not a private certifier) must inspect the site prior to and after demolition works. Payment of the demolition inspection fee in accordance with Council’s current fees and charges policy must be made. To arrange a Council inspection contact Council’s Customer Service on 8757 9000. After completion of demolition works, the applicant must notify Council within 7 days to assess the site and ensure compliance with AS2601-2001 - Demolition of Structures. (Reason: To ensure compliance with the relevant legislation)

Condition 153 DA2024/0732 det. 09/10/2025 Mixed Use

153. DAANN22 - Obtaining a Construction Certificate for Building Work This Development Consent does not constitute approval to carry out construction work. Construction work may only commence upon the issue of a Construction Certificate, appointment of a Principal Certifier, and lodgement of Notice of Commencement. If demolition is associated with the erection of or extension to an existing building, then demolition must not commence prior to the issue of a Construction Certificate. Document Set ID: 12052763 Version: 4, Version Date: 29/09/2025

Condition 6 da2024/0085 det. 06/09/2024 Basketball Centre

6. DAGCZ03 - Service relocation / Adjustment The applicant shall locate any utility services affected by the proposal and shall be responsible for any damage to, or relocation of services required by the proposal including adjustment to the levels of pit lids etc. All works shall be carried out to the satisfaction of the relevant Authority or Council. All the costs shall be borne by the applicant. (Reason: to protect utility services) Conditions which must be satisfied prior to the commencement of demolition of any building or structure

Condition 118 da2024/0085 det. 06/09/2024 Basketball Centre

118. DAANN22 - Obtaining a Construction Certificate for Building Work This Development Consent does not constitute approval to carry out construction work. Construction work may only commence upon the issue of the relevant Construction Certificate, appointment of a Principal Certifier, and lodgement of Notice of Commencement. If demolition is associated with the erection of or extension to an existing building, then demolition must not commence prior to the issue of the relevant Construction Certificate. (Reason: Information)

Condition 4 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

4. DAGCF02 - Utility Services If the development causes damage to utility services or if it requires the adjustment or relocation of utility services, the applicant shall carry out works, at the applicant’s expense, to the service/s to the satisfaction of the utility provider. (Reason: To protect and ensure the ongoing integrity of utility infrastructure) Document Set ID: 11758583 Version: 1, Version Date: 14/07/2025 Conditions which must be satisfied prior to the commencement of demolition of any building or structure

Condition 128 DA2024/0540 det. 01/04/2025 Staged construction of a two storey administration building for Regents Park Christian…

128. DAANN22 - Obtaining a Construction Certificate for Building Work This Development Consent does not constitute approval to carry out construction work. Construction work may only commence upon the issue of a Construction Certificate, appointment of a Principal Certifier, and lodgement of Notice of Commencement. If demolition is associated with the erection of or extension to an existing building, then demolition must not commence prior to the issue of a Construction Certificate. (Reason: Information).

Condition 164 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

164. DAANN22 - Obtaining a Construction Certificate for Building Work This Development Consent does not constitute approval to carry out construction work. Construction work may only commence upon the issue of a Construction Certificate, appointment of a Principal Certifier, and lodgement of Notice of Commencement. If demolition is associated with the erection of or extension to an existing building, then demolition must not commence prior to the issue of a Construction Certificate.

Condition 8 DA2024/0732 det. 09/10/2025 Mixed Use

8. DAGCZ03 - No Approval for the Use of Each Commercial Tenancy The development consent does not provide the following: a) No approval is given or implied for the use of each commercial tenancy situated on the ground floor of the building. A separate development application or complying development certificate is required for the fit out and use of each of the two tenancies. (Reason: Information) Conditions Which Must be Satisfied Prior to the Commencement of Demolition

Condition 23 DA2024/0732 det. 09/10/2025 Mixed Use

23. DACCC02 - Protection or Management of Public Access If the work involved in the demolition or construction of a building is likely to disrupt or obstruct pedestrian or vehicular traffic in a public place, or the building involves the closure of a public place, a barrier, fence or hoarding shall be erected prior to the commencement of any work, subject to approval of a Road Occupancy Licence by Council. (Reason: Public safety)

Condition 4 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

4. DAGCF02 - Utility Services If the development causes damage to utility services or if it requires the adjustment or relocation of utility services, the applicant shall carry out works, at the applicant’s expense, to the service/s to the satisfaction of the utility provider. (Reason: To protect and ensure the ongoing integrity of utility infrastructure) Conditions Which Must be Satisfied Prior to the Commencement of Demolition.

Condition 21 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

21. DACCC02 - Protection or Management of Public Access If the work involved in the demolition or construction of a building is likely to disrupt or obstruct pedestrian or vehicular traffic in a public place, or the building involves the closure of a public place, a barrier, fence or hoarding shall be erected prior to the commencement of any work, subject to approval of a Road Occupancy Licence by Council. (Reason: Public safety)

Condition 6 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

6. DAGCF02 - Utility Services If the development causes damage to utility services or if it requires the adjustment or relocation of utility services, the applicant shall carry out works, at the applicant’s expense, to the service/s to the satisfaction of the utility provider. (Reason: To protect and ensure the ongoing integrity of utility infrastructure) Conditions Which Must be Satisfied Prior to the Commencement of Demolition.

Condition 6 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

6. DAPDB07 - Site Safety Fencing - Demolition Only The site must be fenced to a minimum height of 1.8m in accordance with SafeWork NSW guidelines to prevent public access throughout demolition. The fencing must be erected before the commencement of any demolition work and be maintained until works are completed. (Reason: Public safety)

Condition 8 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

8. DAPDB07 - Site Safety Fencing - Demolition Only The site must be fenced to a minimum height of 1.8m in accordance with SafeWork NSW guidelines to prevent public access throughout demolition. The fencing must be erected before the commencement of any demolition work and be maintained until works are completed. (Reason: Public safety)

Condition 76 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

76. DADWA12 - Compliance with the Noise Management Plan All demolition, excavation and construction works carried must be carried out in accordance with the approved Noise Management Plan. (Reason: To protect residential amenity) Document Set ID: 11758583 Version: 1, Version Date: 14/07/2025

Condition 70 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

70. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 35 DA2024/0330 det. 28/11/2024 Community Facilities

35. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 43 DA2024/0331 det. 09/05/2025 Mixed - Alterations and additions to the approved development (DA2022/0776)

43. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 60 DA2024/0540 det. 01/04/2025 Staged construction of a two storey administration building for Regents Park Christian…

60. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 67 DA2024/0732 det. 09/10/2025 Mixed Use

67. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 66 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

66. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 62 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

62. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 47 da2024/0085 det. 06/09/2024 Basketball Centre

47. DADWA03 - Site Management All possible and practical steps shall be taken to prevent nuisance to the occupants of the surrounding neighbourhood from windblown dust, debris, noise and the like during the demolition, excavation and building works. (Reason: Health and amenity)

Condition 162 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

162. DAANN13 - Work Health and Safety For information regarding, codes of practice and guidelines regarding demolition and construction work, visit the SafeWork NSW. (Reason: Advisory) Document Set ID: 11758583 Version: 1, Version Date: 14/07/2025

Condition 95 DA2-25/0119 det. 17/07/2025 Two Storey Boarding House

95. DADWC16 - Waste Management Requirements of the approved Waste Management Plan shall be complied with during site preparation and throughout demolition and construction phases of the development. (Reason: Compliance with approval)

Condition 55 DA2024/0330 det. 28/11/2024 Community Facilities

55. DADWC16 - Waste Management Requirements of the approved Waste Management Plan shall be complied with during site preparation and throughout demolition and construction phases of the development. (Reason: Compliance with approval)

Condition 83 DA2024/0540 det. 01/04/2025 Staged construction of a two storey administration building for Regents Park Christian…

83. DADWC16 - Waste Management Requirements of the approved Waste Management Plan shall be complied with during site preparation and throughout demolition and construction phases of the development. (Reason: Compliance with approval)

Condition 89 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

89. DADWC16 - Waste Management Requirements of the approved Waste Management Plan shall be complied with during site preparation and throughout demolition and construction phases of the development. (Reason: Compliance with approval)

Condition 66 da2024/0085 det. 06/09/2024 Basketball Centre

66. DADWC16 - Waste Management Requirements of the approved Waste Management Plan shall be complied with during site preparation and throughout demolition and construction phases of the development. (Reason: Compliance with approval)

Condition 40 DA2024/0330 det. 28/11/2024 Community Facilities

40. DADWA12 - Compliance with the Noise Management Plan All demolition, excavation and construction works carried must be carried out in accordance with the approved Noise Management Plan. (Reason: To protect residential amenity)

Condition 68 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

68. DADWA12 - Compliance with the Noise Management Plan All demolition, excavation and construction works carried must be carried out in accordance with the approved Noise Management Plan. (Reason: To protect residential amenity)

Condition 54 da2024/0085 det. 06/09/2024 Basketball Centre

54. DADWA12 - Compliance with the Noise Management Plan All demolition, excavation and construction works carried must be carried out in accordance with the approved Noise Management Plan. (Reason: To protect residential amenity)

Condition 127 DA2025/0177 det. 24/11/2025 Part 8, part 9-storey residential flat building comprising 74 affordable housing units

127. DAANN13 - Work Health and Safety For information regarding, codes of practice and guidelines regarding demolition and construction work, visit the SafeWork NSW. (Reason: Advisory.)

Condition 126 DA2024/0540 det. 01/04/2025 Staged construction of a two storey administration building for Regents Park Christian…

126. DAANN13 - Work Health and Safety For information regarding, codes of practice and guidelines regarding demolition and construction work, visit the SafeWork NSW. (Reason: Advisory)

Condition 116 da2024/0085 det. 06/09/2024 Basketball Centre

116. DAANN13 - Work Health and Safety For information regarding, codes of practice and guidelines regarding demolition and construction work, visit the SafeWork NSW. (Reason: Advisory)

Condition 87 DA2024/0330 det. 28/11/2024 Community Facilities

87. DAANN13 - Work Health and Safety For information regarding, codes of practice and guidelines regarding demolition and construction work, visit the SafeWork NSW. (Reason: Advisory)

Condition 97 DA2024/0331 det. 09/05/2025 Mixed - Alterations and additions to the approved development (DA2022/0776)

97. DAANN13 - Work Health and Safety For information regarding, codes of practice and guidelines regarding demolition and construction work, visit the SafeWork NSW. (Reason: Advisory)

Condition 162 DA2025/0095 det. 09/12/2025 Construction of a mixed-use development

162. DAANN13 - Work Health and Safety For information regarding, codes of practice and guidelines regarding demolition and construction work, visit the SafeWork NSW.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.