9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Bayside Demolition Conditions

39 demolition conditions imposed by Bayside across 5 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

Condition 22 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

22. Sydney Airport The following conditions are imposed by the Sydney Airport Corporation Limited (SACL) in their letter dated 23 January 2017 and must be complied with: a) The building must not exceed a maximum height of 91metres AHD, including all lift over-runs, vents, chimneys, aerials, antennas, lightning rods, any roof top garden plantings, exhaust flues etc. b) Separate approval must be sought under the Regulations for any equipment (i.e. cranes) required to construct the building. Construction cranes may be required to operate at a height significantly higher than that of the proposed controlled activity and consequently, may not be approved under the Regulations. Therefore, it is…

Condition 13 DA-2024/268 det. 16/07/2025 Food manufacturing facility

13. A garbage container with a tight-fitting lid. Condition reason: To provide details of measures for the safe and appropriate disposal of demolition waste and the protection of the public and surrounding environment during the carrying out of demolition works on the site. 26 Dilapidation Report - Public Domain - Pre-Construction - Major Prior to the commencement of any work, a professional engineer specialising in civil, structural, or geotechnical engineering shall prepare a Dilapidation Report detailing the current condition of Bayside Council’s infrastructure adjoining, and within 50m of, the development site. This includes the condition of the road reserve (including footpath, nature…

Condition 2 DA-2024/268 det. 16/07/2025 Food manufacturing facility

2. NSW EPA (2020) ‘Guidelines for Implementing the Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2019. Condition reason: To protect human health and the environment in accordance with legislative requirements. 94 Additional information – Contamination – Cease work addition Any new information that comes to light during demolition, remediation or construction which has the potential to alter previous conclusions about site contamination and remediation must be notified to Council, the appointed Accredited Site Auditor (Contaminated Land) and the accredited certifier immediately. All work on site must cease until the Council is notified in writing…

Condition 66 MDA-2025/27 det. 23/07/2025 Residential Aged Care Facility

66. All excavation and backfilling associated with the erection or demolition of a building must be executed safely and in accordance with appropriate professional standardsa nd guarded and protected to prevent them from being dangerous to life or property. When excavation associated with the erection or demolition of a building extends below the level of the base of the footings of a building or an adjoining allotment of land, you shall: (a) preserve and protect the building from damage and (b) underpin and support the building in an approved manner, if necessary and (c) give notice of intention to excavate below the level of the base of the footings of a building on an adjoining allotment…

Condition 96 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

96. Noise during Construction The following shall be complied with during construction and demolition: a) Construction Noise Noise from construction activities associated with the development shall comply with the NSW Environmental Protection Authority’s Interim Construction Noise Guidelines and the Protection of the Environment Operations Act 1997. b) Level Restrictions Any building works being carried out must ensure that any noise caused by demolition, vegetation removal or construction does not exceed the NSW Environmental Protection Authority’s Interim Construction Noise Guidelines and the Protection of the Environment Operations Act 1997. c) Out of hours work For any activity that is…

Condition 25 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

25. Noise during Demolition and Construction The following shall be complied with during construction and demolition: (a) Construction Noise Noise from construction activities associated with the development shall comply with the Demolition and Construction Noise Management Plan approved prior to commencement of demolition, and shall be in accordance with the NSW Environmental Protection Authority's Interim Construction Noise Guidelines and the Protection of the Environment Operations Act 1997. (b) Out of hours work For any activity that is required to be undertaken outside normal construction hours due to public safety, traffic related reasons, or significant concrete pour, a separate Out…

Condition 83 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

83. Waste Management Plan Before the issue of the relevant construction certificate, the Waste Management Plan listed in condition1 must be amended to include the following: a) Provide a demolition phase waste management plan, as per Council’s Waste Management Technical Specification 2022. b) Provide a construction phase waste management plan, as per Council’s Waste Management Technical Specification 2022. c) The applicant must provide a swept path ensuring that council requirements for collection vehicles are met. d) In the Ongoing Waste Management Plan, the bulky waste storage room and waste storage areas are readily accessible to residents. e) Provide details of the bin storage rooms,…

Condition 63 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

63. Protection of Council’s Property During Demolition, Excavation and Construction, care must be taken to protect Council’s infrastructure, including street signs, footpath, kerb, gutter, and drainage pits etc. Protecting measures shall be maintained in a state of good and safe condition throughout the course of demolition, excavation, and construction. The area fronting the site and in the vicinity of the development shall also be made safe for pedestrian and vehicular traffic at all times. Any damage to Council’s infrastructure (including damage caused by, but not limited to, delivery vehicles, waste collection, contractors, sub-contractors, concrete delivery vehicles) shall be fully…

Condition 113 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

113. Protection of Council’s Property During excavation and construction, care must be taken to protect Council’s infrastructure, including street signs, footpath, kerb, gutter and drainage pits etc. Protecting measures shall be maintained in a state of good and safe condition throughout the course of demolition, excavation, and construction. The area fronting the site and in the vicinity of the development shall also be made safe for pedestrian and vehicular traffic at all times. Any damage to Council’s infrastructure (including damage caused by, but not limited to, delivery vehicles, waste collection, contractors, sub-contractors, concrete delivery vehicles) shall be fully repaired in…

Condition 88 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

88. Signs on site A sign must be erected in a prominent position on any site on which building work or demolition work is being carried out: a) showing the name, address and telephone number of the Principal Certifier for the work, and b) showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside work hours, and c) stating that unauthorised entry to the work site is prohibited. Any such sign is to be maintained while the building work or demolition work is being carried out but must be removed when the work has been completed. Note: This does not apply in relation to building work or demolition work that…

Condition 29 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

29. Waste disposal verification statement On completion of demolition work: a) a signed statement must be submitted to the Principal Certifier verifying that demolition work, and any recycling of materials, was undertaken in accordance with the waste management plan approved under this consent, and b) if the demolition work involved the removal of asbestos, an asbestos clearance certificate issued by a suitably qualified person, must be submitted to Certifier within 14 days of completion of the demolition work. DA-2024/374 17 Condition reason: To provide for the submission of a statement verifying that demolition waste management and recycling has been undertaken in accordance with the…

Condition 116 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

116. Waste Disposal Verification Statement On completion of demolition work: a) A signed statement must be submitted to Council verifying that demolition work, and any recycling of materials, was undertaken in accordance with the waste management plan approved under this consent, And Bayside Council Page 63 of 87 DA-2024/169 b) If the demolition work involved the removal of asbestos, an asbestos clearance certificate issued by a suitably qualified person, must be submitted to Council within 14 days of completion of the demolition work. REASON To provide for the submission of a statement verifying that demolition waste management and recycling has been undertaken in accordance with the…

Condition 55 MDA-2025/27 det. 23/07/2025 Residential Aged Care Facility

55. A sign must be erected in a prominent position on any work site on which worki nvolved in the erection or demolition of a building is being carried out: (a) stating that unauthorised entry to the work site is prohibited, and (b) showing the name of the person in charge of the work site and a telephone number at which that person may be contacted outside working hours. Any such sign is to be removed when the work has been completed. This condition does not apply to: (c) building work carried out inside an existing building or (d) building work carried out on premises that are to be occupied continuously (both during and outside working hours) while the work is being carried out.

Condition 18 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

18. Toilet Facilities (a) Toilet facilities must be available or provided at the work site before works begin and must be maintained until the works are completed at a ratio of one toilet plus one addiitional toilet for every 20 persons employed at the site, and (b) Each toilet must: (i) Be a standard flushing toilet connected to a public sewer, or (ii) Have an on-site effluent disposal system approved under the Local Government Act 1993, or (iii) Be a temporary chemical closet approved under the Local Government Act 1993. Condition reason: To ensure compliance with the Local Government Act 1993. Demolition and Construction Noise Management Plan

Condition 15 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

15. Notice of commencement for demolition At least one week before demolition work commences, written notice must be provided to council and the occupiers of neighbouring premises of the work commencing. The notice must include: 1. name 2. address, 3. contact telephone number, 4. licence type and license number of any demolition waste removal contractor and, if applicable, asbestos removal contractor, and 5. the contact telephone number of council and 6. the contact telephone number of SafeWork NSW (4921 2900). Condition reason: To advise neighbours about the commencement of demolition work and provide contact details for enquiries

Condition 111 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

111. Site Fencing The site shall be secured by an 1800mm (minimum) high temporary fence for the duration of the work. Gates shall be provided at the opening points and open and secured in such a way as to not obstruct the public footway. Such protection work, including fences, is to be constructed, positioned and maintained in a safe condition to the satisfaction of the Principal Certifier, prior to the demolition of the existing structures and commencement of building operations. REASON To protect the amenity of the neighbourhood and ensure public safety.

Condition 58 MDA-2025/27 det. 23/07/2025 Residential Aged Care Facility

58. Consultation with Ausgrid is essential prior to commencement of work. Failure ton otify Ausgrid may involve unnecessary expense in circumstances such as. (a) where the point of connection and the meter board has been located in positions other than those selected by Ausgrid o (b) where the erection of gates or fences has restricted access to metering equipment. During demolition / excavation / construction The following conditions must be complied with during demolition, excavation and or construction.

Condition 10 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

10. Asbestos removal signage Before demolition work commences involving the removal of asbestos, a standard commercially manufactured sign containing the words ‘DANGER: Asbestos removal in progress’ (measuring not less than 400mm x 300mm) must be erected in a prominent position at the entry point/s of the site and maintained for the entire duration of the removal of the asbestos. Condition reason: To alert the public to any danger arising from the removal of asbestos

Condition 22 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

22. Hours of work Site work must only be carried out between the following times –  For building work, demolition or vegetation removal from 7:00am to 5:00pm on Monday to Saturday. No works to be carried out on Sunday and public holidays. Site work is not to be carried out outside of these times except where there is an emergency, or for urgent work directed by a police officer or a public authority. Condition reason: To protect the amenity of the surrounding area.

Condition 97 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

97. Hours of Work Site work must only be carried out between the following times. For building work, demolition or vegetation removal from 7:00am to 5:00pm on Monday to Saturday. No works to be carried out on Sunday and public holidays. Site work is not to be carried out outside of these times except where there is an emergency, or for urgent work directed by a Police Officer of a public authority. REASON To protect the amenity of the surrounding area.

Condition 12 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

12. Demolition management plan a) Before demolition work commences, a demolition management plan must be prepared by a suitably qualified person. b) The demolition management plan must be prepared in accordance with Australian Standard 2601 – The Demolition of Structures, the Code of Practice – Demolition Work, Bayside Council DCP 2022 and must include the following matters:

Condition 59 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

59. Noise and Vibration requirements While site work is being carried out, noise generated from the site must not exceed the requirements contained in the Demolition and Construction Noise Management Plan approved prior to commencement of demolition works. Condition reason: To protect the amenity of the neighbourhood during construction.

Condition 90 DA-2024/205 det. 29/05/2025 Integrated Development - BATA 2 - Lot F

90. Disconnection of Services before Demolition Work Bayside Council Page 52 of 87 DA-2024/169 Before work commences, all services, such as water, telecommunications, gas, electricity and sewerage, must be disconnected in accordance with the relevant authority’s requirements. REASON To protect life, infrastructure and services.

Condition 67 MDA-2025/27 det. 23/07/2025 Residential Aged Care Facility

67. When soil responses require it: (a) retaining walls associated with the erection or demolition of a building or other approved methods of preventing movement of the soil shall be provided, and (b) adequate provision shall be made for drainage.

Condition 3 DA-2024/293 det. 06/08/2025 2 x 10 storey residential flat buildings

3. Details on the provision of safe access to and from the site during demolition work, including pedestrian and vehicular site access points and construction activity zones DA-2024/293 23

Condition 3 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

3. Details on the provision of safe access to and from the site during demolition work, including pedestrian and vehicular site access points and construction activity zones DA-2024/374 10

Condition 1 DA-2024/293 det. 06/08/2025 2 x 10 storey residential flat buildings

1. Only an asbestos removal contractor who holds the required class of Asbestos Licence issued by SafeWork NSW must carry out the removal, handling and disposal of any asbestos material;

Condition 1 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

1. Only an asbestos removal contractor who holds the required class of Asbestos Licence issued by SafeWork NSW must carry out the removal, handling and disposal of any asbestos material;

Condition 3 DA-2024/268 det. 16/07/2025 Food manufacturing facility

3. Details on the provision of safe access to and from the site during demolition work, including pedestrian and vehicular site access points and construction activity zones.

Condition 21 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

21. Handling of asbestos during demolition While demolition work is being carried out, any work involving the removal of asbestos must comply with the following requirements:

Condition 70 MDA-2025/27 det. 23/07/2025 Residential Aged Care Facility

70. All demolition work shall be carried out in accordance with AS2601 – 2001: The Demolition of Structures and with the requirements of the WorkCover Authority of NSW.

Condition 27 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

27. Asbestos Removal (where Asbestos is found on site) Any material containing asbestos found on site must be removed and disposed of in accordance with:

Condition 8 DA-2024/268 det. 16/07/2025 Food manufacturing facility

8. Details of the equipment that is to be used to carry out demolition work and the method of loading and unloading excavation and other machines.

Condition 8 DA-2024/293 det. 06/08/2025 2 x 10 storey residential flat buildings

8. Details of the equipment that is to be used to carry out demolition work and the method of loading and unloading excavation and other machines

Condition 8 DA-2024/374 det. 09/12/2025 Le Beach Hut cafe and restaurant

8. Details of the equipment that is to be used to carry out demolition work and the method of loading and unloading excavation and other machines

Condition 10 DA-2024/293 det. 06/08/2025 2 x 10 storey residential flat buildings

10. Details of re-use and disposal of demolition waste material in accordance with Bayside DCP 2022 and Bayside Waste Technical Specifications.

Condition 10 DA-2024/268 det. 16/07/2025 Food manufacturing facility

10. Details of re-use and disposal of demolition waste material in accordance with Bayside Development Control Plan 2022.

Condition 11 DA-2024/268 det. 16/07/2025 Food manufacturing facility

11. Location of any reusable demolition waste materials to be stored on-site (pending future use).

Condition 11 DA-2024/293 det. 06/08/2025 2 x 10 storey residential flat buildings

11. Location of any reusable demolition waste materials to be stored on-site (pending future use)

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.