Canada Bay Demolition Conditions

7 demolition conditions imposed by Canada Bay across 5 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

DA2023/0235 det. 08/08/2024

Condition reason: Noise control and amenity 95 Noise, Air or Water Pollution General The use, operation and activities carried out on site shall comply with the requirements of relevant noise legislation and guidelines including but not limited to Noise Policy of Industry 2017, Protection of the Environment Operations Act 1997, relevant Australian Standards on Noise Control on Construction, Maintenance and Demolition Sites, and must not constitute a nuisance in relation to noise, air or water pollution as specified under the Protection of the Environment Operations Act 1997. Acoustic Assessment Following occupation of the building / premises, should it be found that the measures recommended…

DA2023/0135 det. 12/02/2024

Condition Reason Noise, Air or Water Pollution General The use, operation and activities carried out on site shall comply with the requirements of relevant noise legislation and guidelines including but not limited to Noise Policy of Industry 2017, Protection of the Environment Operations Act 1997, relevant Australian Standards on Noise Control on Construction, Maintenance and Demolition Sites, and must not constitute a nuisance in relation to noise, air or water pollution as specified under the Protection of the Environment Operations Act 1997. Acoustic Assessment Following occupation of the building / premises, should it be found that the measures recommended in the acoustic assessment…

DA2023/0222 det. 12/09/2024

99 Noise, Air or Water Pollution General The use, operation and activities carried out on site shall comply with the requirements of relevant noise legislation and guidelines including but not limited to Noise Policy of Industry 2017, Protection of the Environment Operations Act 1997, relevant Australian Standards on Noise Control on Construction, Maintenance and Demolition Sites, and must not constitute a nuisance in relation to noise, air or water pollution as specified under the Protection of the Environment Operations Act 1997. Acoustic Assessment Following occupation of the building / premises, should it be found that the measures recommended in the acoustic assessment are not…

Condition 2 DA2025/0182

2. It is a condition of the development consent that a sign must be erected in a prominent position on a site on which building work, subdivision work or demolition work is being carried out— a. showing the name, address and telephone number of the principal certifier for the work, and b. showing the name of the principal contractor, if any, for the building work and a telephone number on which the principal contractor may be contacted outside working hours, and c. stating that unauthorised entry to the work site is prohibited.

Condition 1 DA2025/0228

1. Trees to be retained as identified in the Arboricultural Impact Assessment (AIA) must have tree protection measures for the ground, trunk and canopy installed and maintained by the project arborist for the duration of demolition and construction works in accordance with the Tree Protection Plan (TPP) in the AIA or the TPP prepared by TMC Reports , dated 25 November 2025.

Condition 3 DA2025/0182

3. The sign must be— a. maintained while the building work, subdivision work or demolition work is being carried out, and b. removed when the work has been completed.

Condition 1 DA2025/0182

1. This section applies to a development consent for development involving building work, subdivision work or demolition work.