Georges River Demolition Conditions

16 demolition conditions imposed by Georges River across 4 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

Condition 42 DA2023/0487 det. 20/12/2024 2 Wellington Street Sans Souci

42. Demolition & Asbestos (PREC10.1) The demolition work shall comply with the provisions of Australian Standard AS2601:2001 – Demolition of Structures, NSW Work Health & Safety Act 2011 and the NSW Work Health & Safety Regulation 2017. The work plans required by AS2601:2001 shall be accompanied by a written statement by a suitably qualified person that the proposals contained in the work plan comply with the safety requirements of the Standard. The work plans and the safety statement shall be submitted to the PC prior to the commencement of works. For demolition work which involves the removal of asbestos, the asbestos removal work must be carried out by a licensed asbestos removalist who…

Condition 43 DA2023/0487 det. 20/12/2024 2 Wellington Street Sans Souci

43. Demolition Notification Requirements (PREC10.2) The following notification requirements apply to this consent: (a) The developer /builder must notify adjoining occupants five (5) working days prior to demolition. Such notification is to be a clearly written note giving the date demolition will commence, contact details of the developer/builder, licensed asbestos demolisher and the appropriate regulatory authority. Notification is to be placed in the letterbox of every premises (including every residential flat or unit, if any) either side and immediately at the rear of the demolition site. (b) Five (5) working days prior to demolition, the developer/builder is to provide written…

Condition 22 DA2021/0306 Demolition works and construction of residential flat building

22. Demolition Notification Requirements - The following notification requirements apply to this consent: (a) The developer /builder must notify adjoining residents five (5) working days prior to demolition. Such notification is to be a clearly written note giving the date demolition will commence, contact details of the developer/builder, licensed asbestos demolisher. Notification is to be placed in the letterbox of every premises (including every residential flat or unit, if any) either side and immediately at the rear of the demolition site. (b) Five (5) working days prior to demolition, the developer/builder is to provide written notification to Council advising of the demolition date,…

Condition 24 DA2024/0612 det. 08/09/2025 Affordable Housing Residential Flat Building

24. Dilapidation Report on Public Land – Major Development Only - Prior to the commencement of works (including demolition and excavation), a dilapidation report must be prepared for the Council infrastructure adjoining the development site. The report must include the following: a) Photographs showing the existing condition of the road pavement fronting the site. b) Photographs showing the existing condition of the kerb and gutter fronting the site. c) Photographs showing the existing condition of the footpath pavement fronting the site. d) Photographs showing the existing condition of any retaining walls within the footway or road. e) The full name and signature of the structural…

Condition 24 DA2021/0306 Demolition works and construction of residential flat building

24. Dilapidation Report on Public Land - Prior to the commencement of works (including demolition and excavation), a dilapidation report must be prepared for the Council infrastructure adjoining the development site. The report must include the following: a) Photographs showing the existing condition of the road pavement fronting the site. b) Photographs showing the existing condition of the kerb and gutter fronting the site. c) Photographs showing the existing condition of the footpath pavement fronting the site. d) Photographs showing the existing condition of any retaining walls within the footway or road. e) The full name and signature of the structural engineer. f) The Dilapidation…

Condition 54 DA2024/0612 det. 08/09/2025 Affordable Housing Residential Flat Building

54. Clause 74 EPAR 2021 Site Excavation Excavation of the site is to extend only to that area required for building works depicted upon the approved plans. All excess excavated material shall be removed from the site. All excavations and backfilling associated with the erection or demolition of a building must be executed safely and in accordance with appropriate professional standards. All excavations associated with the erection or demolition of a building must be properly guarded and protected to prevent them from being dangerous to life or property. If the soil conditions require it, retaining walls associated with the erection or demolition of a building or other approved methods of…

Condition 20 DA2021/0306 Demolition works and construction of residential flat building

20. Waste Management Plan - A final Waste Management Plan incorporating all requirements in respect of the provision of waste storage facilities, removal of all materials from the site that are the result of site clearing, extraction, and, or demolition works and the designated Waste Management Facility shall be submitted to the Crown Certifier prior to the commencement of work. The final Waste Management Plan must state: (a) That it is the responsibility of a designated person to present the bins to the kerb no earlier than 12 hours prior to collection and remove the bins from the kerbside no later than 12 hours post collection. (b) Any garden waste must be removed from the property by a…

Condition 40 DA2023/0487 det. 20/12/2024 2 Wellington Street Sans Souci

40. Waste Management during construction and demolition The applicant must provide details of the proposed contractors used for managing demolition/construction wastes to Council prior to the issue of a Construction Certificate. The applicant must maintain records of licensed waste management disposal for up to 7 years as evidence of correct management of wastes from the development. Copies of all receipts for the disposal, or processing of all such materials shall be submitted to the PCA and Council, where Council is not the Principal Certifying Authority. Reason: To ensure waste is appropriately managed during construction and demolition.

Condition 49 DA2023/0487 det. 20/12/2024 2 Wellington Street Sans Souci

49. Hours of Construction (demolition, excavation and building work) (CON11.2) All construction works and activities must be undertaken within standard hours, as defined by the Interim Construction Noise Guideline (2009) and must adhere to the following requirements: (a) Monday to Friday: 7.00am to 6.00pm (b) Saturday: 8.00am to 1.00pm (c) No work on Sundays or public holidays Note: A penalty infringement notice may be issued for any offence. Reason: To ensure the amenity of the area is protected during construction and the development is constructed in accordance with Council’s requirements.

Condition 59 DA2023/0487 det. 20/12/2024 2 Wellington Street Sans Souci

59. Waste Management Facility (CON11.21) All materials removed from the site as a result of demolition, site clearing, site preparation and, or excavation shall be disposed of at a suitable Waste Management Facility. No vegetation, article, building material, waste or the like shall be ignited or burnt. Copies of all receipts for the disposal, or processing of all such materials shall be submitted to the PCA and Council, where Council is not the Principal Certifying Authority. Reason: To ensure waste is appropriately managed during construction and demolition.

Condition 32 DA2021/0306 Demolition works and construction of residential flat building

32. Hours of construction for demolition and building work - Any work activity or activity associated with the development consent that requires the use of any tools (including hand tools) or any power operated plant and machinery that creates noise on or adjacent to the site shall not be performed, or permitted to be performed, except between the hours of 7.00 am to 5.00 pm, Monday to Saturday inclusive. No work or ancillary activity is permitted on Sundays, or Public Holidays. Note: A penalty infringement notice may be issued for any offence. 17

Condition 40 DA2024/0612 det. 08/09/2025 Affordable Housing Residential Flat Building

40. Hours of construction for demolition and building work Any work activity or activity associated with the development consent that requires the use of any tools (including hand tools) or any power operated plant and machinery that creates noise on or adjacent to the site shall not be performed, or permitted to be performed, except between the hours of 7.00 am to 5.00 pm, Monday to Saturday inclusive. No work or ancillary activity is permitted on Sundays, or Public Holidays. Note: A penalty infringement notice may be issued for any offence.

Condition 39 DA2021/0306 Demolition works and construction of residential flat building

39. Waste Management Facility - All materials removed from the site as a result of demolition, site clearing, site preparation and, or excavation shall be disposed of at a suitable Waste Management Facility. No vegetation, article, building material, waste or the like shall be ignited or burnt. Copies of all receipts for the disposal, or processing of all such materials shall be submitted to the Crown Certifier. 18 Prior to the Issue of an Occupation Certificate

Condition 72 DA2024/0609 det. 17/12/2025 Alterations and additions to existing school

72. Site Safety Fencing Site fencing must be erected in accordance with WorkCover Guidelines, to exclude public access to the site throughout the demolition and/or construction work, except in the case of alterations to an occupied dwelling. The fencing must be erected before the commencement of any work and maintained throughout any demolition and construction work. For more information visit www.workcover.nsw.gov.au

Condition 32 DA2024/0612 det. 08/09/2025 Affordable Housing Residential Flat Building

32. Construction and Demolition Waste Ref: DA2024/0612 Page 22 of 52 The applicant must provide details of the proposed contractors used for managing demolition/construction wastes to the Crown Certifier prior to the commencement of construction. The applicant must maintain records of licensed waste management disposal for up to 7 years as evidence of correct management of wastes from the development.

Condition 3 DA2024/0612 det. 08/09/2025 Affordable Housing Residential Flat Building

3. Easement Delineation On Site During demolition works, the boundary of the easement must be clearly delineated on site by temporary fencing (or other means as agreed by APA), and clearly marked as a hazardous work zone/ restricted area.